Transportation

Transportation System including the maintenance, operations and repairs to city streets, street lights, bike paths, and responds to emergencies and maintains mobility through weather-related events, including snow and ice removal.

Snow Removal

The City of Driggs strives to maintain safe conditions for travelers observing winter driving conditions. However, this is not an absolute “bare pavement” policy. It must be recognized that each storm has its own character with variable conditions such as wind, extreme temperatures, timing, duration, and moisture content. See the following link for our snow removal policy.

Driggs Snow Removal Policy

Transportation Guiding Documents

The following documents provide the city, residents, developers and businesses with direction in regards to current and future transportation infrastructure and operations. 

Transportation Master Plan (August 2007)
Land Development Code - Ch 12 (streets)
Driggs Pathways Plan (Nov 2008)
Main St / Hwy 33 Corridor Plan (June 2008)

 

Projects

Depot Street Improvement Project
Depot Street Road Closure (May 2018)
Howard Avenue Sidewalk (Safe Routes to Schools)
Johnson Ave repair (May 17 2018)
South 5th St Pathway Paving 
Valley Centre Local Improvement District

 

Documents

Public Works Standards and Specifications (2016)
Encroachment Permit
Tree Planting in the ROW Permit

 

Links

Public Works Homepage
Idaho 511 - Road Conditions
Teton County GIS Road Map

 


 

Contact Us

Utility Clerk
Tracy McNeiley
tmcneiley@driggsidaho.org
208-354-2362 ext 2100

 

Public Works Director
Jay Mazalewski, P.E.
jmaz@driggsidaho.org
208-354-2362 ext 2115